The average warranty claim we see in week two of new mini excavator ownership traces back to $3,800 of damage missed on delivery day. Scratched cabs. Low hydraulic oil. Wrong key sets. Missing manuals. Each one becomes a battle after you’ve signed the delivery docket — and most Australian buyers sign without checking. This mini excavator delivery checklist runs through the 18 specific points that take 25 minutes on site but save thousands in disputed claims. Run it every time a new machine arrives, whether it’s from us or anyone else.
Before the Truck Arrives
Five things to organise before delivery rolls up. None of them happen on delivery day.
Paperwork Pack on Hand
Pull your purchase order, finance documents, and insurance binder. The delivery driver brings the delivery docket, machine compliance plate documents, and (for new machines) the operator’s manual. Cross-check serial numbers between your purchase order and the delivery docket before the truck unloads. Mismatches at this stage are easy to resolve. After the docket is signed, they become disputes.
Clear Unloading Space
A 1.7-tonne mini excavator on a tilt trailer needs roughly 9 m of straight reverse clearance and a level, firm surface. Soft ground sinks the tilt deck and damages the rear track frame during dismount. If your driveway is steep, soft, or wet, organise a roadside drop instead.
Camera Ready
Open your phone camera before the truck arrives. Every mini excavator delivery checklist run should start with timestamped photos of the machine as it sits on the truck — both sides, both ends, and the cab interior through the glass. If damage exists pre-delivery, your photo proves it was there before unload, which becomes critical evidence later.

The Walk-Around Inspection (8 Items)
Walk the machine before signing. The delivery driver waits — that’s part of the job. Run through these eight points in order without skipping.
Body, Paint, and Stickers
Look for scratches longer than 100 mm, dents, missing decals, or paint chips. Compare against the spec sheet photos. New machines should look new. Mark any damage on the docket before signing — circle it, date it, photograph it.
Hoses and Hydraulic Lines
Check every visible hose for cuts, abrasions, or weeping at fittings. Hydraulic oil under a 24-hour-old machine indicates a leak the dealer should have caught. Wipe under the machine with a clean rag and check the rag for fluid.
Track Tension and Condition
Tracks should sag 25–35 mm at the midpoint measured between the front and rear sprockets. Look for chunks missing from rubber, exposed steel cords, or oil contamination on the track face. Used machines often need new tracks within 6 months if they arrive worn — flag it on the docket now.
Bucket and Pin Set
Confirm the bucket size on the docket matches what’s bolted on the machine. Check pin sets, locking pins, and quick-hitch couplers (if fitted). New machines often arrive without spare pins — that’s a $180 fight six weeks later if you don’t get it noted today.
Glass and Cab Seal
Run a finger around the cab door seal. Check for cracks in the glass, gaps in the seal, or loose handles. Cab leaks ruin electronics over time and rarely get covered if reported late on warranty.
ROPS/FOPS Compliance Plate
The rollover and falling-object protection structure plate sits inside the cab. Confirm the certification number, date, and Australian Standard compliance (typically AS/NZS 4220). No plate, no Safe Work Australia compliance — and you can’t legally operate the machine on a worksite.
Hour Meter Reading
Record the exact hours. New machines arrive with 2–8 hours from factory testing. Anything above 15 hours on a “new” machine deserves explanation. Used machines should match the documented service history within 5 hours.
Lights, Beacon, and Reverse Alarm
Test each one. Most warranty claims for electrical issues are pre-existing faults missed on delivery and only noticed weeks later when the buyer can’t prove the fault was there at handover.

Starting and Running Checks (6 Items)
Climb in and start the machine. The driver shouldn’t object — this is standard practice on every professional mini excavator delivery checklist.
Cold Start Performance
A Kubota or Yanmar diesel should start cleanly within 5 seconds of key turn. Excessive cranking points to fuel system, glow plug, or battery problems that often emerge as full faults within the first 50 hours.
Gauge Cluster Sequence
Watch every warning light through the start-up sequence. They should all illuminate during self-test, then extinguish once the engine reaches operating parameters. A light that stays on after self-test is a fault.
Hydraulic Pressure and Function
Cycle the boom, arm, bucket, and slew through full range. Listen for relief valve squeal, watch for jerky movement, and check that all functions reach the published cycle times. New machines should be smooth from cold — any roughness flags an issue.
Travel Test
Move the machine forward and reverse 5 m each way. Track tension and steering response should be balanced. Pulling to one side indicates uneven hydraulic flow to the travel motors, often caused by a poorly bled system.
Slew Bearing Play
Park the machine, lock the brakes, and try to rock the cab side-to-side by hand at the bucket tip. Movement above 5–8 mm at the bucket tip indicates worn slew bearings — on a new machine, this is a delivery defect, not normal play.
Fluid Levels After Run
After running for 10 minutes, check engine oil, hydraulic oil, and coolant levels. Note them on the mini excavator delivery checklist for your warranty baseline records.
Documentation Sign-Off
Don’t sign until everything matches.
The Three Documents
Delivery docket (matches your purchase order). Compliance plate documents (for road registration if applicable). Warranty registration form. Get all three in your hands. Get them in writing, not verbal commitments.
The Photo Set
Send yourself an email with timestamped photos of the machine, the hour meter, the compliance plate, and your signed delivery docket. This is your insurance record if anything is disputed in the first 90 days.

Red Flags That Mean Don’t Sign
Three situations should pause the signature on any mini excavator delivery checklist.
Damage You Can’t Quantify
If you spot damage but can’t tell if it’s cosmetic or structural, write “damage observed pending assessment” on the docket before signing — or refuse delivery entirely. Don’t accept verbal reassurances from the driver.
Missing Items on Spec Sheet
Bucket sizes, attachments, beacon lights, or canopy specs missing from the machine but listed on the purchase order. Don’t accept “we’ll send it later” without a written commitment listing a delivery date and item count.
Machine That Won’t Start
A new mini excavator that won’t start on delivery is a return-to-sender situation. Reject delivery, document with photos, and contact the dealer immediately. Don’t accept the machine while waiting for repairs — once unloaded, it becomes your problem.
Frequently Asked Questions
What should I check first on a new mini excavator delivery?
Start with paperwork match — serial number on the compliance plate must match the delivery docket and your purchase order. After that, run the visual walk-around (body, hoses, tracks, hour meter) before climbing in for start-up tests. Photos at every stage protect you if disputes arise later. Every step on this mini excavator delivery checklist matters in the order listed.
Can I refuse delivery of a damaged mini excavator?
Yes. Under standard Australian equipment delivery terms, you have the right to reject a machine that arrives with significant damage or doesn’t match the agreed specification. Document the issue with photos, write your refusal reason on the delivery docket, and have the driver sign acknowledgement. The seller is responsible for collection and either repair or full replacement at no additional cost.
How long does a proper mini excavator delivery inspection take?
A thorough run-through covering all 18 points on this mini excavator delivery checklist takes 25–35 minutes for a 1.5–2 tonne machine. Larger machines (3+ tonne) take 40–50 minutes because there are more hydraulic functions, more access panels, and more attachment points to check. Drivers expect this and most allow up to 60 minutes on site for proper handover.
Contact Achilles Machinery for Mini Excavators
Choosing the right mini excavator for your specific needs can be challenging, with so many options available for different tasks and projects. Achilles Machinery simplifies this process by offering a wide selection of new mini excavators.
To learn more about our range of mini excavators and rental services, reach out to us today. Call us at 1800 325 158 or visit our Brisbane branch at: 168 Kerry Rd, Archerfield QLD 4108.
Our team is ready to assist with any inquiries and help you find the perfect solution for your needs.
Use this checklist while reviewing the models in our current mini excavator range.